Mon–Sat · 9:00–18:00
BPD Developer

North India · Industrial power assessment

Open Access solar for Haryana & Himachal industry.

Discuss Group Captive and solar PPA options for steel and other large industrial consumers. We assess each state, utility connection and project route separately before presenting a commercial offer.

Two states require two connection reviews

For a steel group with plants in both Haryana and Himachal Pradesh, prepare a separate set of connection details and bills for each factory. Punjab offer assumptions must not be carried across to either state without checking the actual project route.

AssessmentHaryana factoryHimachal Pradesh factory
Consumer detailsRecord location, distribution licensee, tariff category, sanctioned load and contract demand.Record location, utility account, tariff category, sanctioned load and contract demand.
Generation routeIdentify proposed plant location and whether the arrangement crosses a state boundary.Identify proposed plant location and whether the arrangement crosses a state boundary.
Network & settlementReview applicable HERC orders, utility procedures and scheduling requirements.Review applicable HPERC orders, utility procedures and scheduling requirements.
Commercial resultPrepare the complete delivered-cost estimate for this connection.Prepare the complete delivered-cost estimate for this connection.

What steel and other industrial consumers should send

Along with 12 monthly bills, send available interval data, production shifts, weekly holidays, scheduled shutdowns and details of existing solar or captive supply. Provide sanctioned load in its billed unit and contract demand separately. Our current commercial priority is factories with sanctioned load above 5 MW.

For a multi-state group, identify which legal entity holds each meter and which entity would sign the PPA. A common corporate owner does not eliminate connection-specific approvals or settlement requirements.

Agree the assessment scope before quoting a tariff

State-specific cost

Check every charge and energy deduction against the applicable order and proposed supply date.

Project availability

Confirm land, evacuation, capacity allocation and a credible approvals programme for the actual project.

Contract structure

Compare consumer ownership, payment security, tenure, allocation and the responsibilities under the proposed PPA.

BPD is accepting project-assessment enquiries for these markets. No ready-to-supply Haryana or Himachal project, local office or secured grid allocation is implied by this page.

Official reference points

Haryana Electricity Regulatory Commission · Himachal Pradesh Electricity Regulatory Commission. The applicable utility and SLDC procedure must also be checked for the consumer and supply route.

Start with your factory’s electricity data.

Our priority is industrial consumers with sanctioned load above 5 MW. A proposal follows load, connectivity and commercial review.

Buying private solar power for a Haryana factory

For a single plant, begin with the distribution licensee and contract demand shown on the bill. If your group runs sites in both Gurugram and Faridabad, share a separate load profile for each connection. A combined monthly total can hide the hours when either plant still needs grid power.

BPD Developer compares the proposed solar allocation, network losses and residual grid purchases. MAXAM INFOTECH PRIVATE LIMITED handles the private-industry PPA once the route and terms are agreed. Haryana Electricity Regulatory Commission

Request a factory power assessment