Industrial solar solutions for factories

Compare solar power purchase agreements with on-site solar ownership. The right model depends on your factory’s consumption pattern, utility tariff, and usable roof or land.

Explore solar power purchase for factories in Punjab or see the scope of turnkey industrial solar EPC.

01 · Off-site · You part-own the asset

Group Captive & Open Access

A solar plant is developed through an SPV with captive-user ownership and annual consumption obligations. The Rule 3 baseline requires at least 26% ownership and 51% annual captive consumption at the qualifying captive-group level, with other applicable conditions. Grid access, charges and documented exemptions determine the factory’s delivered cost.

Discuss Group Captive

What we handle

  • Load and billing analysis, capacity sizing against daytime consumption
  • SPV incorporation, shareholding and consumption-compliance documentation
  • Connectivity and open access applications, PSERC-notified charge working
  • SLDC registration, scheduling and special energy metering
  • EPC delivery, commissioning and long-term energy accounting

Commercials to check before you commit

ItemApplies to Group Captive
Cross-subsidy surchargeSubject to qualifying captive status and applicable verification
Additional surchargeAs notified
Wheeling & transmission chargesApplicable
BankingPer PSERC order
Consumer equity in SPVAt least 26% collectively; applicable ownership conditions also apply
Consumption by captive groupAt least 51% aggregate annual captive use; individual allocation conditions also apply

Every proposal needs the applicable orders and a complete delivered-cost calculation. Review the policy and cost checklist; the investor calculator uses illustrative inputs, not notified tariffs.

02 · On-site · Behind your meter

C&I Rooftop Solar

The fastest route to lower power cost when you have shed area and daytime load. Generation offsets consumption directly behind the meter, with no wheeling charges and no transmission losses. Sizing is set by your daytime demand and your connection's net metering limit — not by how much roof happens to be free.

Discuss rooftop solar

What we handle

  • Structural assessment of sheds, purlins and load-bearing capacity
  • Shadow analysis and module layout to maximise usable roof
  • Net metering application, sanction and inspection with PSPCL
  • Mounting structures rated for site wind speed, DC and AC works
  • Monitoring, module cleaning cycles and preventive maintenance

Planning assumptions we use

Roof area per 100 kWp≈ 8,000–10,000 sq ft
Annual yield≈ 1,500–1,650 kWh/kWp
Typical CUF17–19%
Module warranty25–30 years performance
Delivery modelCAPEX or RESCO

Indicative planning ranges for Punjab. Site-specific figures follow the structural and shadow survey.

03 · Off-site · MW scale

Ground Mount & Utility Scale

When rooftop area cannot carry the load, generation moves to land. These projects are won or lost on two questions asked early: does the nearest substation have evacuation headroom, and can the land be tied up cleanly. Engineering follows those answers — module technology, tracker or fixed tilt, and HT connectivity design.

Discuss ground mount

What we handle

  • Land identification, title and lease or purchase support
  • Evacuation study, substation headroom and HT connectivity design
  • Topography, soil investigation and foundation design
  • Fixed-tilt or single-axis tracker evaluation against site economics
  • Full EPC, testing, charging and long-term O&M

Typical project shape

Land requirement≈ 3.5–4.5 acres per MWp
Capacity band1–25 MWp
StructureFixed tilt / single-axis tracker
Connection11 kV / 33 kV / 66 kV
Common modelGroup Captive SPV
04 · Power purchase · Structure-specific investment

RESCO / PPA

Under a developer-funded power-purchase model, the project owner arranges construction and operations and the consumer buys energy under the agreed PPA. Tariff, escalation, payment security and minimum offtake depend on the contract. Group Captive participation also requires consumer ownership and compliance.

Discuss RESCO / PPA

How it compares

 CAPEXRESCO / PPA
Upfront investmentYouBPD
Asset ownershipYouBPD
Accelerated depreciationYoursNot applicable
O&M responsibilityContractedBPD
Generation riskYouBPD
You pay forThe plantUnits consumed

Suits you if

  • Capital is better deployed in your core manufacturing
  • You want a tariff below your grid rate without owning an asset
  • Your consumption is stable and the site will be occupied long term
  • You would rather someone else carry generation and O&M risk

Connection & evacuation

From module to meter, on one line

Every Group Captive project is finally an electrical question: what leaves the array, what survives the transformer and the wheeling network, and what your meter actually records. This is that path in single-line form.

CB ISOLATOR M ABT / SEM CB 01 PV array 5 × 1 MWp blocks 1500 V DC 02 Inverters String or central 800 V AC 03 Step-up transformer Inverter duty, 0.8/33 kV 33 kV 04 Switchyard VCB · CT / PT · SEM 33 kV 05 PSPCL network Wheeled supply 66 / 33 kV 06 Your plant HT metering · load 11 kV Applicable network losses and charges depend on connection voltage, supply route and the effective order.

Indicative single-line schematic. Voltage levels, transformer rating and the metering arrangement are fixed for your site at the connectivity stage — your project's issued SLD goes out with the DPR.

Also delivered

Services that stand on their own

Feasibility studies & DPRs

Bank-ready detailed project reports: resource assessment, generation modelling, layout, connectivity, cost and financial returns.

Regulatory & approval support

Open access, connectivity, net metering, SLDC registration and PSERC filings — prepared, submitted and followed through.

O&M and energy accounting

Performance monitoring, cleaning cycles, preventive maintenance, monthly settlement and banking reconciliation.

Not sure which model fits?

Send your load details and last twelve bills. We will come back with the two options that actually apply to your connection, and the arithmetic behind each.

Power purchase for steel and large industrial loads

For sanctioned loads above 5 MW, begin with the steel-industry assessment or the regional route that matches your consuming factory.

Steel and industrial PPA guide →

Buying solar power for your factory

BPD Developer assesses private industrial power purchases in Punjab, Haryana, Madhya Pradesh, Uttar Pradesh and Rajasthan. Start with the electricity connection that will receive the power. The utility, operating shifts and proposed generation site determine which options can be costed.

Punjab
Compare the PSPCL bill with a Punjab solar allocation and the electricity still purchased from the grid.
Haryana
Assess each factory connection separately, even when several sites belong to the same industrial group.
Madhya Pradesh
Compare open access and on-site generation against production shifts in Indore, Pithampur and other industrial areas.
Uttar Pradesh
Identify the distribution licensee and receiving meter before comparing an open access offer with the grid bill.
Rajasthan
Check the distribution area, seasonal demand and billing point before allocating solar power to a plant.

MAXAM INFOTECH PRIVATE LIMITED signs private-industry PPAs. NECROPOWER PRIVATE LIMITED delivers turnkey solar EPC projects for factories that choose to build a plant.