Feasibility studies & DPRs
Bank-ready detailed project reports: resource assessment, generation modelling, layout, connectivity, cost and financial returns.
Solutions
Compare solar power purchase agreements with on-site solar ownership. The right model depends on your factory’s consumption pattern, utility tariff, and usable roof or land.
Explore solar power purchase for factories in Punjab or see the scope of turnkey industrial solar EPC.
A solar plant is developed through an SPV with captive-user ownership and annual consumption obligations. The Rule 3 baseline requires at least 26% ownership and 51% annual captive consumption at the qualifying captive-group level, with other applicable conditions. Grid access, charges and documented exemptions determine the factory’s delivered cost.
Discuss Group Captive| Item | Applies to Group Captive |
|---|---|
| Cross-subsidy surcharge | Subject to qualifying captive status and applicable verification |
| Additional surcharge | As notified |
| Wheeling & transmission charges | Applicable |
| Banking | Per PSERC order |
| Consumer equity in SPV | At least 26% collectively; applicable ownership conditions also apply |
| Consumption by captive group | At least 51% aggregate annual captive use; individual allocation conditions also apply |
Every proposal needs the applicable orders and a complete delivered-cost calculation. Review the policy and cost checklist; the investor calculator uses illustrative inputs, not notified tariffs.
The fastest route to lower power cost when you have shed area and daytime load. Generation offsets consumption directly behind the meter, with no wheeling charges and no transmission losses. Sizing is set by your daytime demand and your connection's net metering limit — not by how much roof happens to be free.
Discuss rooftop solar| Roof area per 100 kWp | ≈ 8,000–10,000 sq ft |
|---|---|
| Annual yield | ≈ 1,500–1,650 kWh/kWp |
| Typical CUF | 17–19% |
| Module warranty | 25–30 years performance |
| Delivery model | CAPEX or RESCO |
Indicative planning ranges for Punjab. Site-specific figures follow the structural and shadow survey.
When rooftop area cannot carry the load, generation moves to land. These projects are won or lost on two questions asked early: does the nearest substation have evacuation headroom, and can the land be tied up cleanly. Engineering follows those answers — module technology, tracker or fixed tilt, and HT connectivity design.
Discuss ground mount| Land requirement | ≈ 3.5–4.5 acres per MWp |
|---|---|
| Capacity band | 1–25 MWp |
| Structure | Fixed tilt / single-axis tracker |
| Connection | 11 kV / 33 kV / 66 kV |
| Common model | Group Captive SPV |
Under a developer-funded power-purchase model, the project owner arranges construction and operations and the consumer buys energy under the agreed PPA. Tariff, escalation, payment security and minimum offtake depend on the contract. Group Captive participation also requires consumer ownership and compliance.
Discuss RESCO / PPA| CAPEX | RESCO / PPA | |
|---|---|---|
| Upfront investment | You | BPD |
| Asset ownership | You | BPD |
| Accelerated depreciation | Yours | Not applicable |
| O&M responsibility | Contracted | BPD |
| Generation risk | You | BPD |
| You pay for | The plant | Units consumed |
Connection & evacuation
Every Group Captive project is finally an electrical question: what leaves the array, what survives the transformer and the wheeling network, and what your meter actually records. This is that path in single-line form.
Indicative single-line schematic. Voltage levels, transformer rating and the metering arrangement are fixed for your site at the connectivity stage — your project's issued SLD goes out with the DPR.
Also delivered
Bank-ready detailed project reports: resource assessment, generation modelling, layout, connectivity, cost and financial returns.
Open access, connectivity, net metering, SLDC registration and PSERC filings — prepared, submitted and followed through.
Performance monitoring, cleaning cycles, preventive maintenance, monthly settlement and banking reconciliation.
Send your load details and last twelve bills. We will come back with the two options that actually apply to your connection, and the arithmetic behind each.
For sanctioned loads above 5 MW, begin with the steel-industry assessment or the regional route that matches your consuming factory.
Steel and industrial PPA guide →BPD Developer assesses private industrial power purchases in Punjab, Haryana, Madhya Pradesh, Uttar Pradesh and Rajasthan. Start with the electricity connection that will receive the power. The utility, operating shifts and proposed generation site determine which options can be costed.
MAXAM INFOTECH PRIVATE LIMITED signs private-industry PPAs. NECROPOWER PRIVATE LIMITED delivers turnkey solar EPC projects for factories that choose to build a plant.