Open Access solar for Indore & Pithampur factories.

BPD Developer accepts Group Captive and Open Access assessment enquiries from steel and other industrial consumers with sanctioned load above 5 MW in Indore and Pithampur.

Separate the factory’s base load from production demand

For Indore and Pithampur manufacturing consumers, compare the daytime base load with batch processes, furnace operation, machining, heat treatment and utility services. Record changes between production lines and shifts before selecting a solar allocation.

Steel, foundry & forging

Include full melting and production cycles, idle periods, shutdowns and auxiliaries in the demand profile.

Auto components & engineering

Review line schedules, weekend operation and seasonal production. Account for solar already generated on the factory roof.

Other factories above 5 MW

Textile, process and wider manufacturing units can request the same assessment with their own utility and load data.

Indore office, Pithampur plant: use the consuming meter

If the corporate office is in Indore and the factory is in Pithampur, use the factory’s electricity connection for the project assessment. Include its exact address, legal consumer name, utility, voltage, sanctioned load and contract demand.

Where one group has several factory meters, provide consumption and connection details separately. This allows generation allocation and contract responsibilities to be tested per connection before reviewing the group total.

What a Madhya Pradesh proposal should contain

WorkstreamRequired output
Demand and generation matchA solar-capacity assessment using seasonal and interval consumption, including existing generation.
Connectivity and supply routeIdentification of the proposed generating location, evacuation arrangements and consumer connection.
Regulatory cost reviewApplicable state orders, network costs, losses, banking treatment where available and the residual utility bill.
PPA and ownershipComparison of the proposed supply model, consumer equity where applicable, payment security and contract commitments.
Delivery milestonesProject-specific approval, finance, construction and supply-start assumptions.

A Punjab tariff indication is not an offer of the same delivered rate in Madhya Pradesh. Allocation and pricing require a separate assessment.

Start an Indore or Pithampur assessment

Use the MPERC current-regulations register alongside the applicable utility and SLDC procedures for the actual supply route. BPD is accepting feasibility enquiries; this page does not claim a commissioned local supply project.

Start with your factory’s electricity data.

Our priority is industrial consumers with sanctioned load above 5 MW. A proposal follows load, connectivity and commercial review.

Buying private solar power in Madhya Pradesh

For a foundry in Indore or a production line in Pithampur, separate daytime machinery demand from overnight baseload. Send the tariff category, contract demand and billing-point voltage from the factory bill. We compare an off-site PPA against rooftop generation where roof space is available.

The assessment identifies the proposed grid route, allocation, losses and the remaining distribution bill. BPD Developer can then arrange a PPA discussion with MAXAM INFOTECH PRIVATE LIMITED. Madhya Pradesh Electricity Regulatory Commission regulations

Request a factory power assessment