Open Access and Group Captive proposals need a project-specific review of connectivity, consumer eligibility, ownership, consumption and the orders effective on the supply date.
Group Captive structure
Rule 3, as substituted by the Electricity (Amendment) Rules, 2026, retains the requirements of at least 26% captive-user ownership and 51% aggregate annual captive consumption. Ownership definitions, individual allocation and verification provisions must also be applied. The two percentages alone are not a complete compliance test.
Reference: Ministry of Power, G.S.R. 186(E), 13 March 2026. Confirm applicable subsequent notifications and the relevant verification procedure for the project.
Connectivity and eligibility
Check sanctioned load, contract demand, connection voltage, the proposed supply route and the evacuation capacity available at the relevant substations. Final project capacity and supply dates follow the applicable approvals.
Third-party Open Access, Group Captive and rooftop arrangements have different commercial and regulatory requirements. A zero project-construction payment does not remove a captive user’s equity obligations.
Commercial clarity
Generation tariff is one part of delivered cost.
Cost item
What the proposal must specify
BPD Punjab offer
₹4.40/unit ex-busbar; final billing point and terms in the PPA
Transmission, wheeling and SLDC
Applicable capacity or energy charges and their billing basis
Network losses and banking
Energy deductions, eligible banked units, settlement period and applicable fees
Surcharges, duties and taxes
Project-specific applicability and any documented exemption
Grid balance and demand charges
Residual utility supply, demand obligations and any standby arrangements
Captive equity and security
Consumer ownership contribution, payment security and annual compliance
The website does not present FY 2025–26 charges as current. Each offer should carry the effective order reference and a complete landed-cost calculation. Tax treatment is confirmed for the actual contract structure and invoicing date.
Official reference points
PSERC
Applicable Punjab regulations, tariff orders and decisions.
Use a Punjab assessment for the Punjab consumer connection. For other markets, review the relevant state and supply route before applying charges, exemptions or banking assumptions.
Punjab
Mandi Gobindgarh, Ludhiana, Jalandhar and Mohali consumer assessments.