Work shaped by Punjab's industry.

Photographs from our sites, and — separately — illustrative project profiles showing the capacity, model and siting decisions a typical industrial project turns on.

Roadmap · 2020 — 2026

From utility-scale construction to selling power in Punjab.

Six years of utility-scale delivery across five states, now turned towards one thing: supplying industrial power directly to private factories in Punjab.

350+ MWDelivered across utility-scale projects
6 statesRajasthan, Tamil Nadu, Gujarat, Maharashtra, Madhya Pradesh, Punjab
380 MWLargest park worked on — Neemba, Rajasthan
2026Punjab industrial power supply
  1. 2020Rajasthan
    O2 Power

    Neemba solar park — I&C delivery inside a 380 MW build

    Our team’s first utility-scale delivery role: instrumentation and controls across a 75 MW AC and DC scope inside O2 Power’s 380 MW park at Neemba, Rajasthan.

    Scope held
    I&C — 75 MW AC & DC
    Park total
    380 MW
    Location
    Neemba, Rajasthan 345027
    Plus Code
    9328+8Q
    Open site location ↗
  2. 2021Tamil Nadu
    ReNew Power

    80 MW project at Coimbatore

    Civil works and DC-side delivery on ReNew Power’s 80 MW project in Coimbatore, Tamil Nadu — the team’s first project outside Rajasthan.

    Capacity
    80 MW
    Scope held
    Civil & DC
    Location
    Coimbatore, Tamil Nadu
    Status
    Completed
  3. 2022Rajasthan
    ReNew Power

    110 MW project at Kalijal

    DC and civil scope on ReNew Power’s 110 MW project at Kalijal, Rajasthan — the largest single capacity the team has delivered to date.

    Capacity
    110 MW
    Scope held
    DC & civil
    Location
    Kalijal, Rajasthan
    Plus Code
    74W2+M9W
    Open site location ↗
  4. 2023Gujarat
    Aditya Birla Grasim

    11 MW back-to-back tracker plant, Bhavnagar

    Single-axis tracker plant delivered back-to-back for Aditya Birla Grasim at Bodki, Bhungar in Bhavnagar district, Gujarat.

    Capacity
    11 MW
    Mounting
    Single-axis tracker
    Location
    Bodki, Bhungar, Gujarat 364130
    Plus Code
    62X7+WG2
    Open site location ↗
  5. 2024Maharashtra
    Juniper Green Energy

    75 MW ground-mount project at Kamjalga

    DC-side delivery on Juniper Green Energy’s 75 MW ground-mounted project at Kamjalga, Maharashtra.

    Capacity
    75 MW
    Scope held
    DC
    Location
    Kamjalga, Maharashtra
    Coordinates
    18.624958, 77.245447
    Open site location ↗
  6. 2025West & central India
    BPD Developer · EPC

    EPC in our own name — 50+ industrial rooftop and ground-mount projects

    The year the team stopped delivering only for other developers and began contracting directly with industrial clients: rooftop and ground-mounted plants for factories across Gujarat and Madhya Pradesh.

    Projects
    50+
    Segments
    Industrial rooftop & ground mount
    Locations
    Gandhidham, Anjar, Khategaon, Dewas, Indore, Ahmedabad
    Role
    EPC contractor
  7. 2026Punjab
    BPD Developer · Current

    Selling industrial power to Punjab’s private factories

    BPD Developer is building its own generation in Punjab and supplying factories directly, at a tariff below the state utility’s industrial rate. Current Punjab consumers under discussion and development include Raymond Pipe, HDG Pipe and KS Alloys.

    Offer
    ₹4.40 / unit ex-busbar
    Model
    Group Captive & Open Access
    Consumers
    Raymond Pipe · HDG Pipe · KS Alloys
    Status
    In development

The 2020–2024 entries are projects our founder and core delivery team executed while in senior delivery roles at the developers named, not contracts held by BPD Developer From 2025 the work is contracted in BPD’s own name. Capacities state the scope our team held, and the park total where the scope sat inside a larger build.

Solar project gallery — site photograph 1
Site photograph01 ↗
Solar project gallery — site photograph 2
Site photograph02 ↗
Solar project gallery — site photograph 3
Site photograph03 ↗
Solar project gallery — site photograph 4
Site photograph04 ↗
Solar project gallery — site photograph 5
Site photograph05 ↗
Solar project gallery — site photograph 6
Site photograph06 ↗
Solar project gallery — site photograph 7
Site photograph07 ↗
Solar project gallery — site photograph 8
Site photograph08 ↗
Solar project gallery — site photograph 9
Site photograph09 ↗
Solar project gallery — site photograph 10
Site photograph10 ↗
Solar project gallery — site photograph 11
Site photograph11 ↗

Portfolio

Project profiles

Six shapes an industrial solar project takes in Punjab, and the single variable each one really turns on.

Forging unit

Group Captive, wheeled from a nearby district

Capacity
2.5 MWp
Model
Group Captive SPV
Siting
Ground mount
Turns on
Evacuation headroom
Textile & hosiery

Rooftop across three shed blocks under net metering

Capacity
800 kWp
Model
CAPEX
Siting
Rooftop
Turns on
Shed structure
Auto components

Zero-capex rooftop on a long-term PPA

Capacity
500 kWp
Model
RESCO / PPA
Siting
Rooftop
Turns on
Site occupancy
Steel & foundry

Open access supply against a continuous HT load

Capacity
5 MWp
Model
Open Access
Siting
Ground mount
Turns on
Banking terms
Food processing

Hybrid: rooftop for base load, open access for the balance

Capacity
350 kWp + 1.5 MWp
Model
CAPEX + Captive
Siting
Roof + ground
Turns on
Seasonal load
Multi-unit group

One SPV supplying several units of the same promoter group

Capacity
10 MWp
Model
Group Captive SPV
Siting
Ground mount
Turns on
Equity split

Representative project profiles illustrating typical capacity, model and siting decisions. Capacities are indicative of the segment, not a claim about a specific commissioned plant.

Evaluation

What we look at before proposing anything

  • Consumption. Twelve months of bills — units, maximum demand, tariff category, power factor and how much of the load actually runs in daylight.
  • Connection. Voltage level, sanctioned load, contract demand and the metering arrangement at your boundary.
  • Space. Usable roof area and shed condition, or land parcel, access and topography.
  • Grid. Distance to the nearest substation, evacuation headroom and the wheeling route your power would take.
  • Commercials. Charges in force under the current PSERC order, banking terms and applicable exemptions.
  • Intent. Whether you want to own the asset, claim depreciation, or simply buy cheaper units.

Your plant is the next profile.

Tell us the segment, the location and the load. We will tell you which of these shapes it fits.