We build the generation. The factory buys the power.

BPD Developer is a solar developer and independent power producer. We build plants in Punjab and sell the output directly to private industrial consumers at ₹4.40 per unit ex-busbar — below what the state utility charges industry. This page explains how capital, construction and long-term offtake fit together.

350+ MWUtility-scale solar delivered by our team, 2020–2024
₹4.40/unitIndicative ex-busbar offer, Punjab
5+ MWPriority consumer size, sanctioned load
3Group SPVs, each MCA-registered

The models

Three ways capital works with us.

Which one fits depends on who wants the asset on their balance sheet, and who wants the cheaper unit. We settle that before anything is drafted.

EPC

The client funds and owns the plant. We design, procure, build and commission it, then hand it over with O&M. Suits a factory that wants the depreciation and the asset.

PPA / RESCO

Our SPV funds, owns and operates the plant. The factory signs a long-term power purchase agreement and pays per unit, with no capital outlay and no O&M responsibility.

Investors

Capital funds a plant that we develop, build and run, with an industrial consumer as the contracted offtaker. We hold execution and operations; the investor holds the asset.

Why Punjab industry

A large, credit-worthy load that pays a high tariff.

  • Industrial tariffs are high. Steel, rolling, forging and foundry units in the Mandi Gobindgarh and Ludhiana belt run continuous HT loads and pay among the higher industrial rates in North India.
  • Demand is dense and daytime-heavy. Furnace and rolling cycles overlap well with solar generation, which is what makes an open access or group captive allocation work.
  • The regulatory route is settled. PSERC's open access framework, the 2% in-kind wheeling charge for renewable power used inside Punjab, and the 26% / 51% captive tests under the Electricity Rules are all defined — see Policy & charges.
  • We know the counterparties. Our assessments start from twelve months of actual PSPCL bills and interval demand, not from sanctioned load.

What we bring

Execution, not just development.

CapabilityWhat it means in practice
Utility-scale deliveryAround 350 MW built across five states for O2 Power, ReNew Power, Aditya Birla Grasim and Juniper Green Energy — see the roadmap.
Industrial EPC50+ rooftop and ground-mount projects contracted in BPD's own name since 2025, across Gujarat and Madhya Pradesh.
Regulatory structuringGroup captive equity and consumption compliance, open access applications, PSPCL / PSERC / SLDC coordination.
Corporate structureThree MCA-registered SPVs so each project sits in its own entity — group of companies.
OperationsLong-term O&M on the plants we build, which is what protects a per-unit tariff over a PPA term.

Starting a conversation

What a first discussion covers.

  • The capacity and the site — land, evacuation headroom and distance to the nearest substation.
  • The offtaker — who buys the units, their load profile and their credit standing.
  • The structure — EPC, PPA or investor-owned, and which SPV contracts it.
  • The charge build-up — generation tariff, wheeling, losses, surcharges and taxes, listed separately.
  • The agreement — billing point, minimum offtake, payment security, tenure, transfer and exit.
  • The timeline — approvals, connectivity and construction, with what each one depends on.

Nothing on this page is an offer of securities or investment advice, and no return is quoted or implied. Project economics depend on the site, the offtaker, the charges in force under the applicable PSERC order and the final signed PPA. Figures shown elsewhere on this site are indicative and subject to the agreement.

Tell us what you are looking at.

A site, a factory load, or capital looking for a contracted offtake — start with whichever you have.