EPC
The client funds and owns the plant. We design, procure, build and commission it, then hand it over with O&M. Suits a factory that wants the depreciation and the asset.
Investors
BPD Developer is a solar developer and independent power producer. We build plants in Punjab and sell the output directly to private industrial consumers at ₹4.40 per unit ex-busbar — below what the state utility charges industry. This page explains how capital, construction and long-term offtake fit together.
The models
Which one fits depends on who wants the asset on their balance sheet, and who wants the cheaper unit. We settle that before anything is drafted.
The client funds and owns the plant. We design, procure, build and commission it, then hand it over with O&M. Suits a factory that wants the depreciation and the asset.
Our SPV funds, owns and operates the plant. The factory signs a long-term power purchase agreement and pays per unit, with no capital outlay and no O&M responsibility.
Capital funds a plant that we develop, build and run, with an industrial consumer as the contracted offtaker. We hold execution and operations; the investor holds the asset.
Why Punjab industry
What we bring
| Capability | What it means in practice |
|---|---|
| Utility-scale delivery | Around 350 MW built across five states for O2 Power, ReNew Power, Aditya Birla Grasim and Juniper Green Energy — see the roadmap. |
| Industrial EPC | 50+ rooftop and ground-mount projects contracted in BPD's own name since 2025, across Gujarat and Madhya Pradesh. |
| Regulatory structuring | Group captive equity and consumption compliance, open access applications, PSPCL / PSERC / SLDC coordination. |
| Corporate structure | Three MCA-registered SPVs so each project sits in its own entity — group of companies. |
| Operations | Long-term O&M on the plants we build, which is what protects a per-unit tariff over a PPA term. |
Starting a conversation
Nothing on this page is an offer of securities or investment advice, and no return is quoted or implied. Project economics depend on the site, the offtaker, the charges in force under the applicable PSERC order and the final signed PPA. Figures shown elsewhere on this site are indicative and subject to the agreement.
A site, a factory load, or capital looking for a contracted offtake — start with whichever you have.