Solar power purchase for factories in Punjab

MAXAM INFOTECH PRIVATE LIMITED signs PPAs with private industry. A Punjab factory can buy solar power from an off-site plant through an open access power purchase agreement (PPA). BPD Developer is developing a Punjab solar cluster and assesses third-party open access and group captive supply against your factory’s actual demand, utility connection and delivered power cost. We prioritise power-supply enquiries above 5 MW sanctioned load.

Ex-busbar offer

₹4.40/unit

Indicative power-supply offer for the Punjab cluster, measured at the plant busbar.

What ex-busbar means

Before the network

₹4.40 is the generation tariff at the plant. Transmission and wheeling, losses, surcharges and taxes sit between it and your factory meter, and every assessment lists them separately.

Final PPA terms specify the billing point, applicable grid charges, losses, taxes, payment security and any consumer equity. The figures above are not a confirmed all-inclusive landed cost.

Check eligibility and request a proposal →

Compare solar power purchase models

Third-party open access PPA

The factory buys allocated solar units from a generator. The proposal sets out the billing point, grid charges, losses, settlement and how the factory covers demand outside solar generation hours.

See how delivered solar power cost is calculated →

Group captive solar PPA

Participating factories also take an equity stake in the project company. The assessment covers the equity commitment, energy allocation and the annual ownership and consumption requirements that apply to the project.

Read the Punjab group captive solar guide →

For plants that prefer to own a solar asset on their roof or land, compare industrial solar EPC for factories in Punjab.

Where we focus in Punjab

Mandi Gobindgarh

For steel melting and rolling operations, we review heat cycles, rolling shifts and shutdowns alongside the proposed solar allocation.

Mandi Gobindgarh steel assessment →

Ludhiana

For forging, casting, auto-component, textile and other manufacturing units, separate daytime base load from batch processes. Existing rooftop generation must be included to avoid double counting solar consumption.

Discuss a Ludhiana factory →

Jalandhar

For foundries and manufacturing units, record seasonal output, casting shifts and weekly holidays. A single peak-demand bill does not establish how much solar the factory can use.

Discuss a Jalandhar factory →

Mohali and Chandigarh: share the factory address as well as the corporate-office address. A Mohali factory and a Chandigarh electricity connection must not be assumed to have the same utility or approval route. We assess the consuming connection before applying any Punjab commercial assumptions.

Above 5 MW: our current commercial focus

Our priority is a sanctioned load greater than 5 MW (5,000 kW), including steel, forging, foundry, textiles and other industrial users. This is BPD’s business focus, not a statement of the statutory Open Access minimum. Contract demand in kVA or MVA is a separate value; please provide both exactly as they appear on your bill.

ProvideWhy it matters
12 months of utility billsEstablish seasonal consumption, billed energy, demand and existing tariff category.
Available interval consumption dataMatch generation with actual load, furnace cycles and production shifts.
Sanctioned load, contract demand and voltageDefine the consumer connection for capacity and grid review.
Existing rooftop solar or power-purchase arrangementsAvoid allocating the same load to more than one supply source.
Preferred ownership and PPA structureCompare captive equity, security, contract commitments and power-purchase options.

Match solar supply
to your factory’s demand.

We assess manufacturing consumers including steel, casting, forging, rolling, textiles, auto components and food processing. Punjab engagement focuses on industrial locations including Ludhiana and Mandi Gobindgarh.

The right capacity depends on when you use electricity, the grid connection and the approved supply arrangement. Annual units alone do not determine the right plant size.

Send these inputs

  • Factory name, location and industry
  • Sanctioned load, contract demand and connection voltage
  • Twelve months of electricity bills
  • Available interval consumption data and operating hours
  • Preferred PPA structure and module option

From enquiry to power supply

01 · Assess

Demand & feasibility

Review bills, match generation to load and assess connectivity and indicative landed cost.

02 · Structure

PPA & investment

Agree the supply model, captive ownership where applicable, security, allocation and commercial terms.

03 · Deliver

Approvals to operations

Progress project approvals, financing, EPC, commissioning, metering and ongoing energy accounting.

Cluster status: in development. Commissioning and supply commencement are subject to project approvals and the final agreement.

Invest alongside development

Discuss a project-level investment.

Investor discussions cover land, connectivity, industrial offtake, project costs, financing and governance. Each opportunity is assessed on its own economics.

Speak with the development team

Factory power supply, project participation and investment enquiries.

Contact BPD DeveloperUnderstand policy and delivered cost →

Request your Punjab factory assessment

Start with your factory’s electricity data.

Our priority is industrial consumers with sanctioned load above 5 MW. A proposal follows load, connectivity and commercial review.

Buying private solar power for a Punjab factory

A rolling mill in Mandi Gobindgarh and a textile unit in Ludhiana can use the same monthly units and still need different PPAs. Share the PSPCL bill and a shift-wise or interval load profile so we can compare useful daytime solar, the remaining grid bill and the effect of shutdowns.

Your proposal separates the plant tariff from network charges and losses. MAXAM INFOTECH PRIVATE LIMITED discusses the private-industry PPA for the BPD Developer group. A Punjab cluster offer depends on project availability and your connection.

Request a factory power assessment