An offer of ₹4.40 per unit ex-busbar is a generation tariff, not the price at your factory meter. This guide lists every item between the two under PSERC’s open access regulations, and the questions a finance team should ask before signing.

BPD Developer · Ludhiana & ChandigarhPublished 19 October 202610 min read

Key points

  • BPD’s indicative offers for its Punjab solar cluster is ₹4.40 per unit ex-busbar. It is not an all-inclusive landed cost: the PPA fixes the billing point and how charges are treated.
  • For renewable power wheeled for use within Punjab, PSERC levies transmission and wheeling charges at 2% of the energy injected, irrespective of distance (12th Amendment, July 2025).
  • Green energy open access consumers can bank up to 30% of their monthly consumption from the distribution licensee. Banked energy cannot be drawn in the peak season or peak hours set by the tariff order, and what is unused at the end of the 1 June–31 May settlement period lapses.
  • The right comparison is your whole electricity cost before and after: solar payments plus the PSPCL charges you keep paying, against today’s bill.

Generation tariff and landed cost are different numbers

A solar open access offer quotes a price per unit at a point named in the power purchase agreement (PPA). That point may be the plant, the substation where the plant injects power, or your factory meter. The landed cost is what each unit you actually use ends up costing once it has reached your factory and been settled against your electricity account.

Between the two sit network charges (paid in money or in energy), energy that is deducted or cannot be used, surcharges where the supply route attracts them, taxes, and the utility charges your connection continues to carry. Two offers with the same tariff can produce different landed costs if they are billed at different points or assume different banking.

Landed cost per unit used = (payment to the generator + network and scheduling charges + applicable surcharges + taxes) ÷ units actually used at the factory

Whole-bill comparison = landed solar cost + remaining PSPCL bill (fixed or demand charges, grid energy, any standby) compared with today’s PSPCL bill

The second line matters as much as the first. Solar supplies daytime energy; your connection still carries fixed or demand charges and the energy you draw at night and on cloudy days.

The cost stack, item by item

The table lists each item a Punjab open access proposal should show separately, and where the rule for it is set. Amounts are not given here because they change with each order; a proposal should quote the order and date it uses.

ItemWhat it isWhere it is set
Generation tariffPrice per unit in the PPA. BPD’s indicative Punjab offer: ₹4.40 per unit ex-busbarPPA, which must name the billing point
Transmission and wheelingFor renewable power wheeled within Punjab: 2% of energy injected, in kind, any distance. Projects outside Punjab pay full chargesPSERC 12th Amendment, 2025
Deviation charges125% of the applicable transmission or wheeling charge on capacity used above the open access quantum allowedPSERC 12th Amendment, 2025
Scheduling and losses15-minute scheduling and energy accounting through SLDC; loss treatment per the regulations and tariff orderPSERC open access regulations; tariff order in force
BankingUp to 30% of monthly consumption from the distribution licensee; banking charges in kind; peak-season and peak-hour restrictions10th, 12th and 13th Amendments
Cross-subsidy surchargeApplies to third-party open access, with green energy limits. Not levied on qualifying captive consumptionPSERC 10th Amendment; Rule 3, Electricity Rules 2005
Additional surchargeNot applicable to a green energy open access consumer who pays fixed charges; not levied on qualifying captive consumptionPSERC 10th Amendment; Rule 3
StandbyCommitment charges per kVA if you contract standby supply from the licenseePSERC 10th Amendment
Duties and taxesApplicability depends on the contract structure and invoicing dateState and central notifications
Remaining utility billFixed or demand charges and grid energy for hours solar does not coverPSPCL tariff order

The 2% wheeling charge, worked through

PSERC’s 12th Amendment to its open access regulations (notified 14 July 2025) says that when power from a renewable (NRSE) project is wheeled for consumption within Punjab, transmission and wheeling charges are levied at 2% of the energy injected into the State grid, irrespective of distance. In practice, about 2 of every 100 units injected go towards these charges. Power wheeled from a renewable project outside Punjab pays full transmission and wheeling charges instead.

What this does to price depends on the billing point:

  • Tariff billed on units injected at the plant. You pay for 100 units and are credited with about 98. ₹4.40 per injected unit becomes about ₹4.49 per credited unit (4.40 ÷ 0.98).
  • Tariff billed on units delivered at your factory. The generator carries the 2%, and the tariff already reflects it.

The 2% is one item. How losses and banking are applied to your supply follows the regulations and the tariff order effective on your supply date, so ask for each to be shown on its own line.

How energy deductions change the price per usable unit

The table is arithmetic only. It shows what happens to the two indicative tariffs when a given share of the energy you pay for does not reach your production, for whatever reason: in-kind charges, losses, banking charges or lapsed banked units.

Share of paid energy not used at the factoryEffective cost per credited unit
2%₹4.49
5%₹4.63
8%₹4.78
10%₹4.89

Price per usable unit = tariff ÷ (1 − share not used). The percentages are examples, not Punjab’s notified loss or banking figures, and the table leaves out surcharges, taxes and the remaining utility bill.

Banking: what it covers and what it does not

Banking lets surplus solar energy injected at one time be credited and drawn later. For green energy open access consumers in Punjab, the rules come from three amendments to the PSERC open access regulations:

  • Quantity. Banking is allowed throughout the year, on banking charges levied in kind at the rate the Commission approves. The banked quantity is capped at 30% of the consumer’s total monthly consumption from the distribution licensee; energy banked above that is treated as dumped energy (10th Amendment, 2023).
  • When it can be drawn. Banked energy cannot be drawn during the peak seasonal period or peak load hours, as approved by the Commission in the tariff order of the year (12th Amendment, 2025).
  • How long it lasts. Banked energy carries forward month to month until the end of the settlement period, 1 June to 31 May. Energy unused at the end of that period lapses without compensation. The same amendment extended banking to captive users of renewable captive plants (13th Amendment, May 2026).
  • Accounting. SLDC maintains the energy account of all banking transactions.

For a factory with weekly holidays or planned shutdowns, banking can move part of the surplus into other days. It cannot move energy into the restricted peak periods, and it is limited by the 30% cap. A plant sized so that most solar is used as it is generated is less exposed to banking charges and lapse.

Surcharges: third-party supply versus group captive

The supply route decides which surcharges apply.

Third-party green energy open access

Cross-subsidy surcharge (CSS) applies. For a green energy open access consumer buying from a renewable plant, PSERC’s 10th Amendment provides that CSS shall not be increased, during twelve years from the plant’s date of operation, by more than 50% of the surcharge fixed for the year in which open access is granted, and that CSS shall not exceed 20% of the average cost of supply. Additional surcharge does not apply to a green energy open access consumer who is paying fixed charges.

Group captive

Where the plant qualifies as captive under Rule 3 of the Electricity Rules, 2005 (at least 26% ownership by captive users and at least 51% of generation consumed by them in the financial year), CSS and additional surcharge are not levied on captive consumption. If the plant fails the test for a year, they are payable. Our group captive guide explains the tests and the 2026 changes.

Charges you keep paying to PSPCL

Open access does not replace your connection. Under PSERC’s 10th Amendment:

  • A green energy open access consumer must keep total drawal from open access and the licensee within the sanctioned contract demand. In any 15-minute block, admissible drawal from the licensee is the sanctioned contract demand minus the scheduled open access entitlement.
  • The open access quantum cannot be changed for at least twelve consecutive 15-minute blocks in a day.
  • If you contract standby supply, commitment charges apply per kVA per month, whether or not standby is used. The 10th Amendment set ₹35 per kVA per month, with green energy open access consumers able to opt for standby up to 60 days at ₹50 or up to 80 days at ₹60 per kVA per month, or as the Commission decides from time to time.

Your fixed or demand charges and the energy you draw outside solar hours stay on the PSPCL bill. A fair proposal shows this remaining bill next to the solar cost.

Ten questions to ask about any offer

  1. At which point is the tariff billed: the plant, the injection substation or the factory meter?
  2. Is the route group captive or third-party open access, and which surcharges follow from that?
  3. Which PSERC regulations and tariff order does each charge come from, and with what effective date?
  4. How are the 2% in-kind transmission and wheeling charge and any losses applied?
  5. What share of generation is expected to be banked, and what is assumed about peak-period restrictions and year-end lapse?
  6. What is the expected split between solar used directly, banked and drawn later, and lapsed?
  7. Which fixed or demand charges remain on the PSPCL bill?
  8. Is standby contracted, and at what commitment charge?
  9. Which taxes and duties apply to this contract structure and invoice date?
  10. For group captive: how much equity, what payment security, and who prepares the annual captive verification?

How BPD presents an assessment

We start from twelve months of electricity bills, sanctioned load, contract demand, connection voltage and any interval data. Each assessment shows every component separately: tariff, network charges, energy deductions, banking, applicable surcharges, taxes and the remaining utility bill. Each offer carries the order references in force for the proposed supply date; our website does not present FY 2025–26 charges as current. Tax treatment is confirmed for the actual contract structure and invoicing date.

Our current commercial focus is factories with sanctioned load above 5 MW, such as steel plants and rolling mills. That is a business priority, not the legal minimum: in Punjab, green energy open access is open to consumers with a sanctioned contract demand of 100 kVA or more (PSERC 11th Amendment, 2023).

To model scenarios yourself, the solar investment calculator lets you enter your own charges and losses; its defaults are illustrative, not notified rates. The policy and delivered-cost checklist lists what every proposal must specify.

Common questions

Is ₹4.40 per unit the landed cost of solar at my factory?

No. ₹4.40 per unit ex-busbar is BPD’s indicative offer for its Punjab solar cluster. The landed cost adds network charges, energy deductions, applicable surcharges and taxes, and should be compared with the PSPCL charges you keep paying. The PPA states the billing point.

What are transmission and wheeling charges for solar power wheeled within Punjab?

Under PSERC’s 12th Amendment to its open access regulations (July 2025), transmission and wheeling charges for renewable power wheeled for consumption within Punjab are levied at 2% of the energy injected, irrespective of distance. Renewable power wheeled from outside Punjab pays full transmission and wheeling charges.

How much solar energy can a Punjab factory bank?

A green energy open access consumer can bank up to 30% of its total monthly consumption from the distribution licensee, on banking charges levied in kind. Banked energy cannot be drawn in the peak season or peak hours set by the tariff order, and energy unused at the end of the 1 June to 31 May settlement period lapses without compensation.

Who is eligible for green energy open access in Punjab?

Consumers with a sanctioned contract demand of 100 kVA or more, through one connection or several in the same electricity division of the distribution licensee, under PSERC’s 11th Amendment (October 2023). There is no load limit for captive users.

Does group captive avoid cross-subsidy surcharge in Punjab?

Cross-subsidy surcharge and additional surcharge are not levied on captive consumption when the plant meets Rule 3 of the Electricity Rules, 2005 for the financial year: at least 26% ownership by captive users and at least 51% of generation consumed by them. If the plant fails the test, the surcharges are payable.

Sources

Rules in this article are taken from the official documents below, read on 19 October 2026. Regulators amend these documents; check the version in force on your proposed supply date.

  1. PSERC (Terms and Conditions for Intra-State Open Access) (12th Amendment) Regulations, 2025, Regu. 195, 14 July 2025
  2. PSERC (Terms and Conditions for Intra-State Open Access) (10th Amendment) Regulations, 2023, Regu. 177, 2 June 2023
  3. PSERC (Terms and Conditions for Intra-State Open Access) (11th Amendment) Regulations, 2023, Regu. 180, 12 October 2023
  4. PSERC (Terms and Conditions for Intra-State Open Access) (13th Amendment) Regulations, 2026, Regu. 204, 12 May 2026
  5. Ministry of Power, Electricity (Amendment) Rules, 2026, G.S.R. 186(E), 13 March 2026: substitutes Rule 3 of the Electricity Rules, 2005
  6. PSERC, regulations currently in force (with all amendments)
  7. PSPCL, consumer procedures and commercial circulars

This guide explains published rules in general terms. It is not legal or tax advice, and it does not describe a confirmed project, allocation or price for any factory. BPD’s indicative Punjab offers are subject to the final PPA, approvals and applicable charges.

Ask for a line-by-line landed cost.

Send twelve months of bills, sanctioned load, contract demand and connection voltage. We show each charge separately, with the order it comes from.