Factory rooftop EPC
Use available shed or RCC roof space to offset daytime consumption. The survey checks roof capacity, skylights, vents, access routes and cable runs before equipment selection.
Factory rooftop solar in Punjab →Factory rooftop and ground-mounted solar
NECROPOWER PRIVATE LIMITED delivers turnkey solar projects. BPD Developer designs, procures, builds and commissions solar plants for factories in Punjab. We assess your plant’s daytime demand, roof or land, and electrical connection to recommend a capacity and prepare an itemised EPC proposal.
Request a factory solar assessmentUse available shed or RCC roof space to offset daytime consumption. The survey checks roof capacity, skylights, vents, access routes and cable runs before equipment selection.
Factory rooftop solar in Punjab →Use suitable land for a plant sized to your demand or grid connection. The feasibility review covers site access, drainage, civil foundations, the evacuation route and the point of interconnection.
Ground-mounted solar projects →Factories that prefer to buy electricity under a power purchase agreement can review open access and group captive solar power purchase.
Review utility bills and interval demand, assess roof or land, and produce a layout, indicative generation estimate and electrical single-line diagram.
Specify modules, inverters, mounting structures, cabling and protection. Agree work zones and shutdown windows with the factory team before installation.
Coordinate the applicable inspections and utility interfaces, test plant operation and hand over drawings, warranties, monitoring access and the O&M scope.
The offer sets out capacity in kW AC and kWp DC, equipment specifications, scope exclusions, construction milestones and site-specific assumptions. See the team’s solar project experience.
For forging, auto-component and textile factories, assess the daytime base load and roof condition across each production shed.
For steel plants, rolling mills and foundries, compare solar output with furnace cycles and plan installation around production shutdowns.
For manufacturing and warehouse sites, check usable roof area, electrical interconnection and whether a future expansion changes plant sizing.
Our Punjab office is in Mandi Gobindgarh. Find addresses and contact details.
We compare your daytime demand with the output a roof or land installation can deliver. Site constraints, the electrical connection and the applicable approvals inform the proposed AC and DC capacities.
The construction method and electrical tie-in plan define where work can run alongside operations and which activities need a scheduled shutdown. We agree that sequence during the detailed site review.
Start with the factory location, recent electricity bills, operating shifts, a roof or land layout and any electrical single-line diagram you have. Interval demand data helps refine the design.