Evacuation headroom
Does the nearest substation have the headroom to take the plant’s output? This is checked before anything else.
Ground mount · MW scale
When rooftop area cannot carry the load, generation moves to land. BPD Developer builds MW-scale ground-mounted plants on vacant land at your factory or on leased land elsewhere in Punjab, for steel, forging, textile and manufacturing units, engineered around HT connectivity and evacuation.
Does the nearest substation have the headroom to take the plant’s output? This is checked before anything else.
Can the land be secured cleanly, with clear title and a lease or purchase that lasts the life of the plant?
Engineering follows those answers: module technology, tracker or fixed tilt, and HT connectivity design.
| Item | Typical range |
|---|---|
| Land requirement | ≈ 3.5–4.5 acres per MWp |
| Capacity band | 1–25 MWp |
| Structure | Fixed tilt / single-axis tracker |
| Connection | 11 kV / 33 kV / 66 kV |
| Common model | Group Captive SPV |
Design, engineering, procurement, construction and commissioning by a team with 250+ MW delivered.
A plant on vacant land at the factory site, sized to the full daytime load rather than to roof area.
A plant elsewhere in Punjab, with power wheeled over the PSTCL / PSPCL network to your factory under open access or group captive.
Punjab open access →Group captive solar parks in Punjab in development by BPD Developer. Cluster under development.
Group captive model →Yes. We build C&I rooftop systems on factory sheds and RCC roofs, and ground-mounted plants on land at the factory or on leased land elsewhere in Punjab. Rooftop size is limited by roof area and the metering mode PSPCL allows for your connection; ground-mounted and open access projects can be sized to the full daytime load. We compare the routes against your bill before recommending one.
As a typical planning range, about 3.5–4.5 acres per MWp. The final figure follows the site layout and the choice of fixed-tilt or tracker structures.
A group captive solar project is owned through a special purpose vehicle (SPV) in which the captive users together hold at least 26% of the equity and consume at least 51% of the electricity generated, as required under the Electricity Rules, 2005. Power is wheeled to each factory over the grid, and captive status is verified for every financial year, so shareholding and consumption records must be kept in order.
Yes. Under a RESCO or open access power purchase agreement (PPA), the plant is funded by the developer or the project SPV and your factory pays per unit consumed. Under group captive, the captive users must together hold at least 26% of the SPV’s equity, so a small equity contribution is part of that structure.
Share the land location and area if you have it, your factory’s sanctioned load, connection voltage and twelve months of bills.