Ground-mounted solar plants for Punjab industry.

When rooftop area cannot carry the load, generation moves to land. BPD Developer builds MW-scale ground-mounted plants on vacant land at your factory or on leased land elsewhere in Punjab, for steel, forging, textile and manufacturing units, engineered around HT connectivity and evacuation.

Two questions decide the project

Grid

Evacuation headroom

Does the nearest substation have the headroom to take the plant’s output? This is checked before anything else.

Land

Clean land tie-up

Can the land be secured cleanly, with clear title and a lease or purchase that lasts the life of the plant?

Engineering follows those answers: module technology, tracker or fixed tilt, and HT connectivity design.

Typical project shape

ItemTypical range
Land requirement≈ 3.5–4.5 acres per MWp
Capacity band1–25 MWp
StructureFixed tilt / single-axis tracker
Connection11 kV / 33 kV / 66 kV
Common modelGroup Captive SPV

Full EPC, from land
to long-term O&M.

Design, engineering, procurement, construction and commissioning by a team with 250+ MW delivered.

What we handle

  • Land identification, title and lease or purchase support
  • Evacuation study, substation headroom and HT connectivity design
  • Topography, soil investigation and foundation design
  • Fixed-tilt or single-axis tracker evaluation against site economics
  • Full EPC, testing, charging and long-term O&M

Where the plant can sit

Land at your factory

A plant on vacant land at the factory site, sized to the full daytime load rather than to roof area.

Leased land in Punjab

A plant elsewhere in Punjab, with power wheeled over the PSTCL / PSPCL network to your factory under open access or group captive.

Punjab open access →

Shared solar park

Group captive solar parks in Punjab in development by BPD Developer. Cluster under development.

Group captive model →

Ground-mounted solar: common questions

Can you install solar on my factory roof or on open land?

Yes. We build C&I rooftop systems on factory sheds and RCC roofs, and ground-mounted plants on land at the factory or on leased land elsewhere in Punjab. Rooftop size is limited by roof area and the metering mode PSPCL allows for your connection; ground-mounted and open access projects can be sized to the full daytime load. We compare the routes against your bill before recommending one.

How much land does a ground-mounted solar plant need?

As a typical planning range, about 3.5–4.5 acres per MWp. The final figure follows the site layout and the choice of fixed-tilt or tracker structures.

What is group captive solar in Punjab?

A group captive solar project is owned through a special purpose vehicle (SPV) in which the captive users together hold at least 26% of the equity and consume at least 51% of the electricity generated, as required under the Electricity Rules, 2005. Power is wheeled to each factory over the grid, and captive status is verified for every financial year, so shareholding and consumption records must be kept in order.

Can my factory buy solar power without investing in a plant?

Yes. Under a RESCO or open access power purchase agreement (PPA), the plant is funded by the developer or the project SPV and your factory pays per unit consumed. Under group captive, the captive users must together hold at least 26% of the SPV’s equity, so a small equity contribution is part of that structure.

Send your land and load details.

Share the land location and area if you have it, your factory’s sanctioned load, connection voltage and twelve months of bills.