No network charges
Generation offsets consumption directly behind your meter, with no wheeling charges and no transmission losses on what you use.
C&I rooftop · Behind your meter
BPD Developer designs and installs C&I rooftop solar on factory sheds, warehouses, RCC roofs and commercial buildings across Punjab. Each system is sized to your daytime load and the net metering limit PSPCL allows for your connection, and the roof structure is verified before procurement.
Generation offsets consumption directly behind your meter, with no wheeling charges and no transmission losses on what you use.
System size is set by your daytime demand and your connection’s net metering limit, not by how much roof happens to be free.
| Item | Planning range |
|---|---|
| Roof area per 100 kWp | ≈ 8,000–10,000 sq ft |
| Annual yield | ≈ 1,500–1,650 kWh/kWp |
| Typical CUF | 17–19% |
| Module warranty | 25–30 years performance |
| Delivery model | CAPEX or RESCO |
Indicative planning ranges for Punjab. Site-specific figures follow the structural and shadow survey.
Rooftop solar is the fastest route to a lower power cost when you have shed area and daytime load. We check the roof before we order anything.
Rooftop size is limited by roof area, roof strength and the metering mode PSPCL allows for your connection.
Metal sheds on steel, forging, textile and manufacturing units. Purlins and load-bearing capacity are checked before layout.
Concrete roofs on factory offices, plants and institutional buildings, with mounting structures rated for site wind speed.
Malls, hospitals, hotels, schools and offices: rooftop or open access solar sized to cut daytime electricity bills.
| CAPEX | RESCO | |
|---|---|---|
| Upfront investment | You | BPD |
| Asset ownership | You | BPD |
| Accelerated depreciation | Yours | Not applicable |
| O&M responsibility | Contracted | BPD |
| You pay for | The plant | Units consumed |
Rooftop solar sits on your own shed and is limited by roof area. Open access supplies power from a separate, larger solar plant through the PSTCL / PSPCL network, so a factory with a large sanctioned load can source far more solar energy than its roof can hold. Network charges, losses and banking rules apply and must be included in the delivered cost.
Yes. We size C&I rooftop systems to daytime load under net metering and verify the roof structure before procurement. Where the roof cannot cover the load, open access solar can supply the balance.
As a planning range, about 8,000–10,000 sq ft of usable roof per 100 kWp. The final layout follows a shadow analysis and a structural check of your sheds.
We prepare the net metering application and follow it through sanction and inspection with PSPCL.
Yes. Under a RESCO model the developer funds and owns the plant, and your factory pays only for the units it consumes. Under CAPEX you own the plant and keep the accelerated depreciation.
Share the factory location, roof type and approximate area, sanctioned load and the last twelve electricity bills.