Induction furnace & melting
Provide interval demand through complete heat cycles, not just installed furnace capacity. Include starts, holding periods, production interruptions and the shared auxiliary load.
Steel & energy-intensive manufacturing
A steel plant’s power decision starts with production: melting cycles, rolling shifts, shutdowns and the load that remains when solar is available. BPD Developer assesses Group Captive and third-party Open Access solar PPAs for industrial consumers with sanctioned load above 5 MW.
Provide interval demand through complete heat cycles, not just installed furnace capacity. Include starts, holding periods, production interruptions and the shared auxiliary load.
Record the rolling schedule, idle periods and planned maintenance. The proposal should distinguish production demand from the factory’s continuous electrical base load.
Separate batch melting, heat treatment, presses and auxiliaries. If shifts vary by product or season, include representative operating days for each pattern.
| Decision | Group Captive PPA | Third-party Open Access PPA |
|---|---|---|
| Consumer participation | Consumer ownership contribution and captive compliance must be structured. | Review the offered non-captive supply arrangement and approvals. |
| Commercial comparison | Include equity, security, applicable charges and compliance obligations. | Include applicable surcharges, network costs and payment security. |
| Energy commitment | Test contracted allocation against consumption and captive obligations. | Test contracted allocation, minimum offtake and settlement terms. |
| Supply balance | Assess residual utility supply and any separate storage or firming arrangement. | Assess residual utility supply and any separate storage or firming arrangement. |
A solar-only PPA does not by itself provide round-the-clock energy or backup during a grid outage. Capacity and supply dates follow the actual project, approvals and signed contract.
Ask for the billing point, unit adjustment for losses, all applicable network and scheduling costs, banking treatment, utility balance, and the treatment of unused or short-delivered energy. Keep power cost, consumer equity and refundable security separate so the finance team can compare offers.
Review the landed-cost checklist →For a multi-factory group, prepare a separate meter and utility schedule for each location. An aggregate group load cannot replace the individual connection review.
Our primary market is Mandi Gobindgarh and Ludhiana, with Jalandhar and Mohali factory enquiries also assessed.
Punjab Open Access →Keep state, utility and connection assumptions separate when comparing proposals across plants.
State-by-state assessment →Evaluate Madhya Pradesh factory demand, existing generation and the proposed evacuation route.
Madhya Pradesh assessment →Steel and other industrial groups elsewhere in India can share their factory details for an initial feasibility review. Availability is assessed for each project and consumer location.
No. Sanctioned load is one input. Useful capacity depends on interval demand, generation, existing solar, approved connection limits and settlement conditions.
An assessment must retain the cost of remaining utility energy, demand and other applicable obligations. We compare the complete combined cost.
The PPA should define energy allocation, minimum offtake, permitted settlement or banking where available, and who carries the cost of unused supply.
No. Above 5 MW is BPD’s current commercial priority. Eligibility depends on the applicable rules and the consumer’s connection.
Our priority is industrial consumers with sanctioned load above 5 MW. A proposal follows load, connectivity and commercial review.