Rooftop solar
Panels on your own shed or RCC roof, connected at your meter. Limited by roof area and your DISCOM’s metering rules, with no network charges on what you use.
Factory rooftop solar →Delhi NCR · Industrial power assessment
Factories in Okhla, Narela, Bawana, Gurugram, Manesar, Faridabad and Noida: rooftop solar where the roof allows, and green energy open access where the load qualifies, each costed against your DISCOM bill.
NCR spans Delhi, Haryana and Uttar Pradesh. The route and the delivered cost depend on which state your consuming connection sits in, so each factory is assessed on its own connection.
| Area | Regulator | What applies |
|---|---|---|
| Delhi: Okhla, Narela, Bawana | DERC | Rooftop solar is usually the first step. Consumers with at least 100 kW of contracted demand or sanctioned load, through one connection or several with the same DISCOM, can apply for green energy open access under DERC’s regulations (DERC removed the earlier 11 kV condition in 2026). |
| Haryana NCR: Gurugram, Manesar, Faridabad | HERC | Haryana’s open access rules apply. Haryana assessment → |
| UP NCR: Noida, Ghaziabad | UPERC | Uttar Pradesh’s open access rules apply. |
Panels on your own shed or RCC roof, connected at your meter. Limited by roof area and your DISCOM’s metering rules, with no network charges on what you use.
Factory rooftop solar →Power from a separate, larger solar plant through the grid, for loads the roof cannot cover. Network charges, losses and banking rules apply and must be included in the delivered cost.
Each route is costed on delivered power, including network charges and losses.
Delhi Electricity Regulatory Commission · Haryana Electricity Regulatory Commission · Uttar Pradesh Electricity Regulatory Commission. The applicable DISCOM and SLDC procedure must also be checked for each connection.
BPD is accepting project-assessment enquiries for Delhi NCR. No ready-to-supply NCR project or secured grid allocation is implied by this page.
Yes, we assess factories in Delhi, Gurugram, Manesar, Faridabad, Noida and Ghaziabad. Inside Delhi, rooftop solar is usually the first step, and consumers with at least 100 kW of contracted demand or sanctioned load, through one connection or several with the same DISCOM, can apply for green energy open access under DERC’s regulations (DERC removed the earlier 11 kV condition in 2026). In Haryana and UP NCR, the state commission’s open access rules apply. Each route is costed on delivered power, including network charges and losses.
No. That indicative offer is for BPD’s Punjab cluster. NCR proposals are costed separately for each connection, including network charges and losses under the applicable state rules.
Rooftop solar sits on your own shed and is limited by roof area. Open access supplies power from a separate, larger solar plant through the PSTCL / PSPCL network, so a factory with a large sanctioned load can source far more solar energy than its roof can hold. Network charges, losses and banking rules apply and must be included in the delivered cost.
Share your DISCOM bill, sanctioned load and factory address. We come back with the routes that apply to your connection.