Key points
- The Green Energy Open Access Rules, 2022 set a national eligibility threshold of 100 kW contracted demand or sanctioned load, with no load limit for captive consumers.
- In Delhi, DERC’s First Amendment Regulations, 2026 deleted the earlier “connected at 11 kV or above” condition. Consumers with 100 kW or more, through one connection or several with the same DISCOM, are now eligible.
- Gurugram, Manesar and Faridabad fall under HERC; Noida and Ghaziabad under UPERC. Each state sets its own charges, banking terms and procedures.
- BPD’s ₹4.40 per unit ex-busbar offer is for its Punjab cluster and do not apply in NCR. NCR proposals are costed for each connection.
One region, three regulators
The National Capital Region spans Delhi, Haryana and Uttar Pradesh. The open access route and its delivered cost depend on the state in which your consuming connection sits, so each factory is assessed on its own connection.
| Area | Regulator | What applies |
|---|---|---|
| Delhi: Okhla, Narela, Bawana | DERC | Rooftop solar is usually the first step. Consumers with at least 100 kW of contracted demand or sanctioned load, through one connection or several with the same DISCOM, can apply for green energy open access. |
| Haryana NCR: Gurugram, Manesar, Faridabad | HERC | Haryana’s open access rules apply. |
| UP NCR: Noida, Ghaziabad | UPERC | Uttar Pradesh’s open access rules apply. |
The applicable DISCOM and SLDC procedure must also be checked for each connection.
The national framework
The Ministry of Power notified the Electricity (Promoting Renewable Energy Through Green Energy Open Access) Rules, 2022 on 6 June 2022 (G.S.R. 418(E)). The parts that shape every state’s rules are:
- Eligibility. Consumers with contracted demand or sanctioned load of 100 kW or more can take green energy open access. There is no load limit for captive consumers.
- Single window. Applications are made on the portal of the Central Nodal Agency and routed to the nodal agency notified by the state commission.
- Time limit. The nodal agency must approve a complete application within fifteen days, failing which it is deemed approved, subject to the technical requirements set by the state commission.
- Schedule stability. State commissions may require a consumer not to change its open access quantum for a minimum number of time blocks, which cannot be more than twelve.
- State regulations. Each state commission amends its own regulations, consistent with the Rules, and sets the charges.
The Rules have since been amended, so the state regulations in force, not the 2022 text alone, decide charges and banking for a given connection.
Delhi: what DERC changed in 2026
DERC notified its Terms and Conditions for Green Energy Open Access Regulations, 2024 on 12 November 2024. As first notified, they limited green energy open access to consumers with contracted demand or sanctioned load of 100 kW or more connected at 11 kV or above.
The DERC (Terms and Conditions for Green Energy Open Access) (First Amendment) Regulations, 2026 deleted the words “connected at 11kV or above” from the definitions of entity and green energy open access consumer and from the eligibility regulation. Eligibility now reads, in substance:
DERC’s explanatory memorandum on the amendment gives the reason: the voltage condition excluded consumers who met the load criterion but were connected below 11 kV, and the national framework is load-based. For an industrial unit in Okhla, Narela or Bawana on an LT connection, the question is now its contracted demand or sanctioned load, including other connections it holds with the same DISCOM, rather than its supply voltage. Technical feasibility, metering and the DISCOM and SLDC procedures still apply.
Haryana NCR: Gurugram, Manesar and Faridabad
Factories in Haryana’s part of NCR are governed by HERC’s regulations. Eligibility, charges, banking and scheduling should be read from HERC’s current regulations and orders, together with the distribution licensee’s procedure.
For a group with plants in both Haryana and Punjab, keep the reviews separate. Punjab assumptions, including BPD’s Punjab cluster offers, must not be carried into a Haryana proposal without checking the actual project route. Our Haryana and Himachal page lists what a Haryana assessment needs.
UP NCR: Noida and Ghaziabad
Factories in Noida and Ghaziabad are governed by UPERC’s open access regulations and the procedures of the Uttar Pradesh distribution licensee and SLDC. As with Haryana, eligibility, charges and banking should be taken from the commission’s current text for the proposed supply date.
Rooftop or open access in NCR
On your roof
Panels on your own shed or RCC roof, connected at your meter. Rooftop solar is limited by roof area and your DISCOM’s metering rules, with no network charges on what you use. Inside Delhi it is usually the first step.
From a solar plant elsewhere
Green energy open access brings power from a separate, larger solar plant through the grid, for load the roof cannot cover. Network charges, losses and banking rules apply and must be included in the delivered cost. The comparison that matters is the whole bill before and after.
The route comparison guide sets out how to decide between the two and how to combine them.
What an NCR assessment needs
- Factory name, address and state
- DISCOM name and tariff category
- Sanctioned load, contract demand and connection voltage, and any other connections with the same DISCOM
- Twelve months of electricity bills
- Roof type and approximate area, if considering rooftop
BPD is accepting project-assessment enquiries for Delhi NCR. No ready-to-supply NCR project or secured grid allocation is implied by this guide, and each route is costed on delivered power under the applicable state rules.
Common questions
Who can take green energy open access in Delhi?
Under DERC’s Green Energy Open Access Regulations, 2024 as amended by the First Amendment Regulations, 2026, any consumer with contracted demand or sanctioned load of 100 kW or more, through a single connection or several connections aggregating 100 kW in the area of the same distribution licensee. There is no load limit for a consumer with a captive generating plant.
Is the 11 kV condition still in force for green energy open access in Delhi?
No. DERC’s First Amendment Regulations, 2026 deleted the words “connected at 11kV or above” from the definitions and the eligibility regulation of its 2024 green energy open access regulations. Eligibility is now based on contracted demand or sanctioned load.
Do the same open access rules apply in Gurugram and Noida as in Delhi?
No. Gurugram, Manesar and Faridabad are in Haryana and follow HERC’s regulations; Noida and Ghaziabad are in Uttar Pradesh and follow UPERC’s. Each state sets its own charges, banking terms and procedures within the national Green Energy Open Access Rules.
Does BPD’s ₹4.40 per unit offer apply in Delhi NCR?
No. That indicative offer is for BPD’s Punjab solar cluster. NCR proposals are costed separately for each connection, including network charges and losses under the applicable state rules.
Should a Delhi factory start with rooftop solar or open access?
Rooftop solar is usually the first step where the roof allows, because it has no network charges on energy used. Open access suits load the roof cannot cover. Each route should be costed on delivered power against the current DISCOM bill.
Sources
Rules in this article are taken from the official documents below, read on 19 October 2026. Regulators amend these documents; check the version in force on your proposed supply date.
- Ministry of Power, Electricity (Promoting Renewable Energy Through Green Energy Open Access) Rules, 2022, G.S.R. 418(E), 6 June 2022 (Gazette copy hosted by MERC)
- DERC (Terms and Conditions for Green Energy Open Access) Regulations, 2024 (notified 12 November 2024)
- DERC (Terms and Conditions for Green Energy Open Access) (First Amendment) Regulations, 2026
- DERC, explanatory memorandum to the (Terms and Conditions for Green Energy Open Access) (First Amendment) Regulations, 2026
- Haryana Electricity Regulatory Commission (HERC)
- Uttar Pradesh Electricity Regulatory Commission (UPERC)
This guide explains published rules in general terms. It is not legal or tax advice, and it does not describe a confirmed project, allocation or price for any factory. BPD’s indicative Punjab offers are subject to the final PPA, approvals and applicable charges.