Contact us ↗

Industrial power / Maharashtra

Industrial solar PPA in Maharashtra

For manufacturing businesses in Pune, Chakan, Nashik and industrial clusters elsewhere in Maharashtra, identify the distribution licensee, voltage and contract demand before procurement.

Request a factory power assessment ↗

Assess the electricity you can replace

Automotive component and fabrication facilities can have distinct weekday and weekend load patterns; compare rooftop usable area with off-site solar allocation and existing renewable contracts.

Compare the supply structure and landed cost

Use the current MERC orders and applicable distribution utility procedures to evaluate grid charges, settlement, banking and approval timelines. Separate the PPA tariff from the landed delivered cost.

Relevant project experience

The company profile reports prior-role team experience on Juniper Green Energy’s Kamjalga project (75 MW AC / 92 MWp DC). It is not BPD-owned operational capacity.

View historical experience ↗

What to share with BPD

  • 12 months of electricity bills and interval data if available.
  • Sanctioned load, contract demand and supply voltage.
  • Current rooftop or off-site generation, factory shifts and shutdowns.
  • Preferred ownership model and proposed contract term.

Enquiries are assessed case by case. Project availability, eligibility, commercial terms and approvals are not guaranteed. No local office is implied.